How Long Do Custom Pins, Coins and Medals Take? A Realistic 4 to 8 Week Timeline

Short answerPlan about 4 to 8 weeks from paying the mold fee to delivery. You confirm our proof, then the physical sample takes about 7 days. After you approve it and pay the 50% deposit, mass production takes 10 to 15 days normally and around 20 days in peak season (plan for about 15 to 20), then shipping.

The timeline step by step

After the mold fee is paid we send a proof for you to confirm; some customers confirm the same day, others take several days. The physical sample then takes about 7 days. Once you approve the sample and pay the 50% deposit, mass production starts. It takes 10 to 15 days normally and around 20 days in peak season; we are busy all year, so plan for about 15 to 20 days. Then shipping. Plan about 4 to 8 weeks in total.

Timeline from mold fee to delivery
StepWhat happensTypical timeWho controls it
QuoteYou send artwork, size, quantity, destination and your dateWe reply within 24 hoursUs
Mold feePaid first through PayPal; this starts the ordern/aYou
ProofWe send the proof (artwork) for you to confirmSent after the mold fee is paidUs
Proof confirmationYou confirm the proofSome customers the same day, others several daysYou
Physical sampleWe make the physical sampleAbout 7 daysUs
Sample approval and depositYou approve the sample and pay the 50% depositYour decisionYou
Mass productionProduction starts after approval and deposit10 to 15 days normally; around 20 days in peak season (plan for about 15 to 20)Us
ShippingThe balance is paid before shipmentDepends on method and route, quoted separately; air freight typically 4 to 7 days in transitCarrier
TotalMold fee to deliveryAbout 4 to 8 weeksn/a

Which steps you control and which we control

You control how fast you confirm the proof, how many people need to approve it, and how fast you approve the physical sample. We control the sample (about 7 days) and mass production (10 to 15 days normally and around 20 days in peak season; plan for about 15 to 20). The quickest way to save time is to name one person who approves the proof and the sample, and to send complete details with the first quote request.

Why this is 4 to 8 weeks and not 2 to 4

Some suppliers quote production time alone, or start counting after the sample is approved. Our 4 to 8 weeks starts when the mold fee is paid and includes proof confirmation, the physical sample, production and shipping. Tip: ask any supplier which steps their number includes.

What can make it longer

Counting back from the date you need it

Work back from the day the items must be in your hands, not the event date itself, and allow time to receive and check them. Plan for the 8-week end of the range. If your date is closer than that, send it with the quote request and we check the schedule against your actual project before confirming.

Plan backwards
Start fromSubtractResult
Your in-hands date8 weeksLatest day to pay the mold fee and send the artwork

Rush orders can ship in as little as about 7 days in the best case, depending on design and quantity. Rush production is available for an added fee, so you get your order faster. See rush orders for events.

Shipping time is separate

The 4 to 8 weeks runs to delivery, so it includes shipping. Courier and sea freight take different times and are quoted per route. Air freight typically takes 4 to 7 days in transit. That is transit time only, not a delivery promise. Freight is listed as a separate line in the quote, and DDP depends on the destination and order. See shipping and duties for custom coins, pins and medals.

What to send for a schedule check

One real order timeline

For one real order of 400 plated medals with lanyards for an association's annual event in Spain, the time from proof confirmation to delivery was about one month in total. The design drawing took about 1 week, the physical sample was ready on day 10, production took about 2 weeks and shipping about 1 week. This was one order, not a typical time and not a promise; our general plan stays about 4 to 8 weeks from the mold fee to delivery. Read the full case on our order-process page.

Frequently asked questions

How long do custom enamel pins take to make?

Plan about 4 to 8 weeks in total. After the mold fee is paid we send a proof for you to confirm, and the physical sample then takes about 7 days. Once you approve the sample and pay the 50% deposit, mass production takes 10 to 15 days normally and around 20 days in peak season (plan for about 15 to 20 days), then shipping.

How long do custom challenge coins take?

The same steps and total apply as for pins: proof, physical sample (about 7 days), mass production (10 to 15 days normally and around 20 days in peak season; plan for about 15 to 20 days), then shipping. Plan about 4 to 8 weeks from the mold fee to delivery.

How long does the physical sample take?

About 7 days after you confirm the proof.

How long does mass production take?

Mass production takes 10 to 15 days normally and around 20 days in peak season. We are busy all year, so plan for about 15 to 20 days. Production starts after you approve the sample and pay the 50% deposit.

Does the 4 to 8 weeks include shipping?

Yes. The total runs from the mold fee to delivery, so it includes shipping. Freight is listed as a separate cost in the quote, and transit time depends on the method and route.

Why do some suppliers say 2 to 4 weeks?

Some suppliers quote production time alone, or start counting after sample approval. Our 4 to 8 weeks starts when the mold fee is paid and includes proof confirmation, the physical sample, production and shipping. Ask any supplier which steps their number includes.

What can delay my order?

Slow or multiple approvers on the proof or the sample, sample revisions, peak-season production (around 20 days instead of 10 to 15) and complex designs. Quantity, destination, carrier capacity and customs also depend on the order and route.

When should I order for a fixed date?

Work back from the date the items must be in your hands, not the event date, and plan for the 8-week end of the range. If your date is closer, send it with the quote request and we check the schedule against your project before confirming.

How fast do you reply to a quote request?

Within 24 hours, with the pieces, the mold fee and shipping as separate lines.

Who controls the proof time?

You do. We send the proof after the mold fee is paid and you confirm it; some customers confirm the same day, others take several days.

Can you rush an order?

Yes. Rush orders can ship in as little as about 7 days in the best case, depending on design and quantity. Rush production is available for an added fee, so you get your order faster. See rush orders for events.

How long does air freight take?

Air freight typically takes 4 to 7 days in transit. That is transit time only. Freight is a separate cost in the quote, and DDP depends on the destination and order.

Does the factory have a peak season?

We are busy all year, so plan for about 15 to 20 days of production (around 20 days is typical).

Do you have a real example of how long an order took?

Yes, one order: 400 plated medals with lanyards for an association's annual event in Spain took about one month in total from proof confirmation to delivery. It is one order, not a typical time or a promise; the general plan is about 4 to 8 weeks from the mold fee. See the case on our order-process page.

Get a schedule check

Send your artwork, quantity, destination and real in-hands date. We reply within 24 hours and check the schedule before confirming.

A sketch or reference image is fine. You confirm the proof before the sample and production.

We reply with the quote, the mold fee and shipping as separate lines, within 24 hours.